Watchtower/Law library/Economic Crime (Transparency and.../59 Urgent designation of persons by...
As last captured

Economic Crime (Transparency and Enforcement) Act 2022 · CHAPTER 2 Imposition of sanctions etc

59 Urgent designation of persons by description

s. 59 · in force: yes

Captured statutory text (L5)

59 Urgent designation of persons by description

(1)Section 12 of the 2018 Act (designation by persons by description under a designation power) is amended in accordance with subsections (2) to (9).
(2)After subsection (1) insert—
(1A)The regulations must contain provision for the Minister to be able to choose whether to provide that persons of a specified description are designated persons under either—
(a)the standard procedure, or
(b)the urgent procedure.
(3)For subsection (2) substitute—
(2)The regulations must contain provision which prohibits the exercise of that power under the standard procedure except where conditions A and C are met.
(4)Omit subsection (4).
(5)In subsection (5) omit paragraph (b) (and the “and” before it).
(6)After subsection (5) insert—
(5A)The regulations must provide that under the urgent procedure—
(a)the Minister may provide that persons of a specified description are designated persons where condition C is not met, but conditions A, D and E are met, and
(b)the persons cease to be designated persons at the end of the period of 56 days beginning with the day following the day on which the persons became designated persons unless, within that period, the Minister certifies that—
(i)conditions A and C are met, or
(ii)conditions A, D and E continue to be met.
(5B)The regulations must also provide that, under the urgent procedure, in a case where the Minister makes a certification under subsection (5A)(b)(ii), the designation ceases to have effect at the end of the period of 56 days beginning with the day immediately following the period mentioned in subsection (5A)(b), unless within that period the Minister certifies that conditions A and C are met.
(5C)Condition D is that the description of persons specified is of persons (or some persons) to which, or in relation to which, relevant provision (whenever made) applies under the law of—
(a)the United States of America;
(b)the European Union;
(c)Australia;
(d)Canada;
(e)any other country specified for the purposes of this paragraph in regulations made by an appropriate Minister.
(5D)Condition E is that the Minister considers that it is in the public interest to provide that persons of a specified description are designated persons under the urgent procedure.
(5E)For the purposes of condition D, relevant provision is provision that the Minister considers—
(a)corresponds, or is similar, to the type of sanction or sanctions in the regulations under section 1, or
(b)is made for purposes corresponding, or similar, to any purpose of any type of sanction or sanctions in the regulations under section 1.
(7)In subsection (7), after “designated persons” insert “under the standard procedure”.
(8)After subsection (7) insert—
(7A)The regulations must, in relation to any case where the Minister provides that persons of a specified description are designated persons under the urgent procedure, require the information given under the provision made under section 10(3) to include a statement—
(a)that the provision is made under the urgent procedure,
(b)identifying the relevant provision by reference to which the Minister considers that condition D is met in relation to persons of the specified description, and
(c)setting out why the Minister considers that condition E is met.
(7B)The regulations must provide that, in relation to any case where the Minister provides that persons of a specified description are designated persons under the urgent procedure, the Minister must, after the end of the period mentioned in subsection (5A)(b), or if the Minister has made a certification under subsection (5A)(b)(ii) the period mentioned in subsection (5B), but otherwise without delay—
(a)in a case where the persons cease to be designated persons, take such steps as are reasonably practicable to inform the persons that they have ceased to be designated persons, or
(b)in any other case, take such steps as are reasonably practicable to give each designated person a statement of reasons.
(9)In subsection (8)—
(a)for “subsection (7)” substitute “subsections (7) and (7A)”;
(b)for the words from “which have led” to the end substitute —
(a)in the case of a designation under the standard procedure, which have led the Minister to make the provision designating persons of that description, and
(b)in the case of a designation under the urgent procedure, as a result of which the persons do not cease to be designated persons at the end of the period mentioned in subsection (5A)(b) or (5B) (as the case may be).
(10)In section 22 of the 2018 Act (power to vary or revoke designation made under regulations), in subsection (4), in paragraph (b)—
(a)for “12(2)” substitute “12”;
(b)omit the words in brackets.
Full captured verbatim text
(1) Section 12 of the 2018 Act (designation by persons by description under a designation power) is amended in accordance with subsections (2) to (9).

(2) After subsection (1) insert—

(1A) The regulations must contain provision for the Minister to be able to choose whether to provide that persons of a specified description are designated persons under either—

(a) the standard procedure, or

(b) the urgent procedure.

(3) For subsection (2) substitute—

(2) The regulations must contain provision which prohibits the exercise of that power under the standard procedure except where conditions A and C are met.

(4) Omit subsection (4).

(5) In subsection (5) omit paragraph (b) (and the “and” before it).

(6) After subsection (5) insert—

(5A) The regulations must provide that under the urgent procedure—

(a) the Minister may provide that persons of a specified description are designated persons where condition C is not met, but conditions A, D and E are met, and

(b) the persons cease to be designated persons at the end of the period of 56 days beginning with the day following the day on which the persons became designated persons unless, within that period, the Minister certifies that—

(i) conditions A and C are met, or

(ii) conditions A, D and E continue to be met.

(5B) The regulations must also provide that, under the urgent procedure, in a case where the Minister makes a certification under subsection (5A)(b)(ii), the designation ceases to have effect at the end of the period of 56 days beginning with the day immediately following the period mentioned in subsection (5A)(b), unless within that period the Minister certifies that conditions A and C are met.

(5C) Condition D is that the description of persons specified is of persons (or some persons) to which, or in relation to which, relevant provision (whenever made) applies under the law of—

(a) the United States of America;

(b) the European Union;

(c) Australia;

(d) Canada;

(e) any other country specified for the purposes of this paragraph in regulations made by an appropriate Minister.

(5D) Condition E is that the Minister considers that it is in the public interest to provide that persons of a specified description are designated persons under the urgent procedure.

(5E) For the purposes of condition D, relevant provision is provision that the Minister considers—

(a) corresponds, or is similar, to the type of sanction or sanctions in the regulations under section 1, or

(b) is made for purposes corresponding, or similar, to any purpose of any type of sanction or sanctions in the regulations under section 1.

(7) In subsection (7), after “designated persons” insert “under the standard procedure”.

(8) After subsection (7) insert—

(7A) The regulations must, in relation to any case where the Minister provides that persons of a specified description are designated persons under the urgent procedure, require the information given under the provision made under section 10(3) to include a statement—

(a) that the provision is made under the urgent procedure,

(b) identifying the relevant provision by reference to which the Minister considers that condition D is met in relation to persons of the specified description, and

(c) setting out why the Minister considers that condition E is met.

(7B) The regulations must provide that, in relation to any case where the Minister provides that persons of a specified description are designated persons under the urgent procedure, the Minister must, after the end of the period mentioned in subsection (5A)(b), or if the Minister has made a certification under subsection (5A)(b)(ii) the period mentioned in subsection (5B), but otherwise without delay—

(a) in a case where the persons cease to be designated persons, take such steps as are reasonably practicable to inform the persons that they have ceased to be designated persons, or

(b) in any other case, take such steps as are reasonably practicable to give each designated person a statement of reasons.

(9) In subsection (8)—

(a) for “subsection (7)” substitute “subsections (7) and (7A)”;

(b) for the words from “which have led” to the end substitute

—

(a) in the case of a designation under the standard procedure, which have led the Minister to make the provision designating persons of that description, and

(b) in the case of a designation under the urgent procedure, as a result of which the persons do not cease to be designated persons at the end of the period mentioned in subsection (5A)(b) or (5B) (as the case may be).

(10) In section 22 of the 2018 Act (power to vary or revoke designation made under regulations), in subsection (4), in paragraph (b)—

(a) for “12(2)” substitute “12”;

(b) omit the words in brackets.

What this provision means

Model summary, checked against the text on the left.

Relevance to Signicat: 2/3 · detailed summary (L4) Status: ok · Stored artifact; current recipe verification unavailable

Establishes standard and urgent procedures for designating persons by description under designation powers.

(2) The regulations must contain provision which prohibits the exercise of that power under the standard procedure except where conditions A and C are met.
(5A) The regulations must provide that under the urgent procedure—
(5B) The regulations must also provide that, under the urgent procedure, in a case where the Minister makes a certification under subsection (5A)(b)(ii), the designation ceases to have effect at the end of the period of 56 days beginning with the day immediately following the period mentioned in subsection (5A)(b), unless within that period the Minister certifies that conditions A and C are met.
Regulations under section 12 of the 2018 Act must permit the Minister to choose between standard and urgent procedures for designating persons of a specified description. The standard procedure is prohibited unless conditions A and C are met. Under the urgent procedure, designation may be made where condition C is not met but conditions A, D (relevant provision applies under the law of the US, EU, Australia, Canada, or specified country), and E (public interest) are met. Urgent designations cease after 56 days following the day they became designated unless the Minister certifies conditions A and C are met or conditions A, D, and E continue; a continuation certification extends designation by a further 56 days unless conditions A and C are certified.
screening.pep_sanctions_adverse_media

Refers to

cross-reference internal_cite · s. 59

Referred to by

cross-reference internal_cite · s. 59

cross-reference internal_cite · s. 61

Part summaries

0 of 0 parts have a verified summary.

L1 unavailable for current verification: the overall summary needs every part verified. Provisions and the verified summaries remain readable.

Verification findings (173)

synthesis coverage: missing/unverified L2 part-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-3

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-4

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-5

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-6

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-7

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-8

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-9

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-10

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-11

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-12

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-13

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-14

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-15

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-15A

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-15B

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-16

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-17

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-17A

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-18

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-19

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-20

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-21

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-22

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-23

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-24

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-25

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-26

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-27

synthesis coverage: missing/unverified L2 part-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-28

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-28A

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-29

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-29A

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-30

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-31

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-32

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-32A

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-33

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-34

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-35

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-36

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-37

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-38

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-39

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-40

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-41

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-42

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-43

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-43A

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-44

synthesis coverage: missing/unverified L2 part-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-45

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-46

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-47

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-48

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-49

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-50

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-51

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-52

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-53

synthesis coverage: missing/unverified L2 part-3-chapter-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-54

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-55

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-56

synthesis coverage: missing/unverified L2 part-3-chapter-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-57

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-58

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-59

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-60

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-61

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-62

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-63

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-64

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-65

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-66

synthesis coverage: missing/unverified L2 part-4

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-67

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-68

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-69

synthesis coverage: missing evaluation uk:ukpga/2022/10#section-70

synthesis coverage: missing/unverified L2 schedule-1-part-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-1-paragraph-1

synthesis coverage: missing/unverified L2 schedule-1-part-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-1-paragraph-2

synthesis coverage: missing/unverified L2 schedule-1-part-3

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-1-paragraph-3

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-1-paragraph-4

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-1-paragraph-5

synthesis coverage: missing/unverified L2 schedule-1-part-4

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-1-paragraph-6

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-1-paragraph-7

synthesis coverage: missing/unverified L2 schedule-1-part-5

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-1-paragraph-8

synthesis coverage: missing/unverified L2 schedule-1-part-6

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-1-paragraph-9

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-1-paragraph-10

synthesis coverage: missing/unverified L2 schedule-2-part-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-3

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-4

synthesis coverage: missing/unverified L2 schedule-2-part-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-5

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-6

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-6A

synthesis coverage: missing/unverified L2 schedule-2-part-3

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-7

synthesis coverage: missing/unverified L2 schedule-2-part-4

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-8

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-9

synthesis coverage: missing/unverified L2 schedule-2-part-5

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-10

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-11

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-12

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-13

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-14

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-15

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-16

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-17

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-18

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-19

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-20

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-21

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-22

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-23

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-24

synthesis coverage: missing/unverified L2 schedule-2-part-6

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-24A

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-2-paragraph-25

synthesis coverage: missing/unverified L2 schedule-3-part-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-3-paragraph-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-3-paragraph-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-3-paragraph-3

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-3-paragraph-4

synthesis coverage: missing/unverified L2 schedule-3-part-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-3-paragraph-5

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-3-paragraph-6

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-3-paragraph-7

synthesis coverage: missing/unverified L2 schedule-4-part-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-3

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-4

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-5

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-6

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-7

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-8

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-9

synthesis coverage: missing/unverified L2 schedule-4-part-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-10

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-11

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-12

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-13

synthesis coverage: missing/unverified L2 schedule-4-part-3

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-4-paragraph-14

synthesis coverage: missing/unverified L2 schedule-5

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-5-paragraph-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-5-paragraph-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-5-paragraph-3

synthesis coverage: missing/unverified L2 schedule-6

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-6-paragraph-1

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-6-paragraph-2

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-6-paragraph-3

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-6-paragraph-4

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-6-paragraph-5

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-6-paragraph-6

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-6-paragraph-7

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-6-paragraph-8

synthesis coverage: missing evaluation uk:ukpga/2022/10#schedule-6-paragraph-9

Instrument tier unavailable

Change history as published

S. 29 omitted (26.10.2023 for specified purposes, 4.3.2024 in so far as not already in force) by virtue of Economic Crime and Corporate Transparency Act 2023 (c. 56), ss. 170(1)(b), 219(1)(2)(b); S.I. 2024/269, reg. 2(z54)

S. 29A omitted (26.10.2023 for specified purposes, 4.3.2024 in so far as not already in force) by virtue of Economic Crime and Corporate Transparency Act 2023 (c. 56), ss. 170(1)(b), 219(1)(2)(b); S.I. 2024/269, reg. 2(z54)

Pending effects amendments not yet applied to this text

No captured pending effects.

Provenance

Every claim the system makes about this text is traceable to these identifiers.

Instrument
uk:ukpga/2022/10
Part
CHAPTER 2 Imposition of sanctions etc
Version
182e65dd10498ae86ea06030…
Content hash
sha256 e8bd78d8bb67f61fa2315d08…
Source
legislation.gov.uk/ukpga/2022/10